London Borough of Bromley

Builders in Orpington

We cover Orpington, Petts Wood, Chelsfield, Green Street Green and St Mary Cray. The stock is interwar and post-war, laid out on wide plots with side access, which keeps both the building work and the logistics simple.

Postcodes
BR5, BR6
Housing stock
1930s and post-war semi-detached and detached houses with hipped roofs, integral garages and long rear gardens.

Typical work here

Hip-to-gable loft conversions with rear dormers, single-storey rear extensions running the full width of the house, and garage conversions to home offices, utility rooms and annexes. Two-storey side extensions are more achievable here than in inner South-East London, because the plots are wide enough to keep a gap to the boundary.

Approvals

Most of it is permitted development, and we take out a Lawful Development Certificate to prove it. Parts of Petts Wood sit within a conservation area where permitted development rights are restricted, so we confirm the designation on the council map before anything is designed rather than after.

Local services

What we build in Orpington

01

Ground floor extensions in Orpington

More about House Extensions & Side Returns

A ground floor extension is the most common job we build in Orpington and Petts Wood. The interwar and post-war houses here sit on wide plots with long gardens, so a single-storey rear extension can run the full width of the house and still leave plenty of garden. Most become a kitchen extension with an open-plan dining and family room, lit by rooflights or a roof lantern.

Side extensions work well here too. With side access on most houses, a single-storey side extension can take a utility room, a downstairs WC or a wider kitchen, and a two-storey side extension is often achievable because the plots keep a gap to the boundary.

Under permitted development, a single-storey rear extension can usually go 3 metres deep on a semi and 4 metres on a detached house, or up to 6 and 8 metres with prior approval. Parts of Petts Wood are a conservation area where those rights are restricted, so we check before we draw. Most extensions take 12 to 16 weeks on site.

02

Loft conversions in Orpington

More about Loft Conversions

The hipped roofs on Orpington's 1930s semis suit a hip-to-gable loft conversion. We square off the hip into a gable end and add a full-width rear dormer, which gives a proper double bedroom with an en suite and full head height over the new stair. On detached houses with a larger roof, a dormer loft conversion to the rear is often enough on its own.

Most of these are permitted development, within 50 cubic metres of extra roof space on a semi or detached house. We apply for a Lawful Development Certificate to prove it, serve Party Wall notices on the shared wall, and get Building Control sign-off on the structure, insulation and fire escape route. A loft conversion in Orpington typically takes 8 to 12 weeks on site.

03

Garage conversions in Orpington

More about Garage Conversions & Builds

Many Orpington houses have an integral or attached garage that is too narrow for a modern car. Converting it is one of the quickest ways to add a room: a home office, a playroom, a utility room or an annexe with its own shower room.

We infill the door opening with matching brick and a window, insulate the floor, walls and roof, and bring in heating, power and lighting. Most garage conversions need no planning application unless the original permission for the house removed those rights, which we check first, and every one is signed off by Building Control. A garage conversion takes 4 to 6 weeks on site.

Common questions

The things people ask before they commit

How much does an extension cost in South-East London?

It depends far more on the house than on the floor area, which is why a rate per square metre is misleading. Ground conditions, drainage runs, the state of the existing structure, access for materials and the specification you choose all move the figure, sometimes substantially. We survey the property, price the work line by line and give you a fixed written quotation before anything starts, so the number you agree is the number you pay unless you change the scope.

Do I need planning permission?

Often not. Many single-storey rear extensions and rear dormers are permitted development. However, permitted development rights are restricted in conservation areas, on flats and maisonettes, and where an Article 4 direction applies, all of which are common across Blackheath, Brockley, Greenwich and Dulwich. We confirm your position at the first visit, before you spend anything on drawings.

How long will the work take?

Every project is different, so timescales can vary depending on the scope, complexity and individual requirements of the project. As a general guide, a structural opening can take one to three weeks, a garage conversion around four to six weeks, and a loft conversion around eight to twelve weeks. Larger renovations may take ten to twenty weeks. Every quotation includes a project programme outlining the expected start date and key stages, so you’ll know what to expect from the outset.

Can we stay in the house during the build?

For extensions, loft conversions and garage conversions, almost always. We build the shell before breaking through, seal the working area with dust screens and keep a working kitchen and bathroom available. For a full refurbishment we phase the work floor by floor, though most families choose to move out for the first few weeks.

Do you handle Building Control and Party Wall notices?

Yes, both are included. We submit the Building Control notice, book the inspections and hand you the completion certificate at the end. Where the Party Wall etc. Act 1996 applies we serve the notices on the adjoining owners on your behalf and build to the awarded terms.

Are you insured, and is the work guaranteed?

We carry public liability insurance and provide the certificate with the quotation. Workmanship is guaranteed on complete renewal work, as this is work we have built from start to finish; repair work is not covered by our workmanship guarantee. Manufacturer warranties on roofing membranes, glazing and boilers are registered in your name and handed over in the completion pack.

How are payments structured?

Payments are staged against agreed milestones, set out in your quotation before work begins — each instalment due only as that phase starts, so costs stay clear and predictable throughout. We don't ask for large deposits up front; the one exception is long-lead-time materials like glazing and steel, invoiced ahead of ordering, with the supplier order visible to you.

Next step

Tell us what you are trying to do with the house.

We will come out, measure up and tell you honestly whether it works. The site visit and the written quotation are free, and there is no obligation attached to either.